The 5 acre Educational Campus ground in Mira Road
The perennial problem of flooding of the 5-acre ground in Mira Road in every monsoon lasting 4 months of the year needs to be addressed without any further delay as it has led to the constant deterioration of the school and orphanage buildings and puts us under financial strain every year on additional labour that has to be deployed to flush out water through water pumps and hose pipes which if allowed to stand accumulated in the school ground would lead to water-borne diseases.
We definitely take care of the health, hygiene and well-being of our students and the orphans by having a Medical Care Centre on our campus but the problem needs a permanent solution.
Therefore We should start the work of installation of a “Drainage System” in the 5-acre ground which as per estimates would cost Rs. 2 Crores.